News

McLaren Construction surpasses Net Zero Targets at Landmark Leeds Logistics Hub

Key points

Industrial & Logistics

A pivotal logistics warehouse scheme now completed in Leeds has met and surpassed its net zero carbon construction targets, delivered by McLaren Midlands and North.

Successfully achieving an embodied carbon target to practical completion lower than first proposed, ensuring a more sustainable build and reducing the carbon offset payment, McLaren Construction Midlands and North completed works on Sherburn42 - a 660,000 sq. ft. logistics warehousing space located in Sherburn-in-Elmet at the end of November, appointed by commercial real estate investor and developer, Firethorn Trust.

The 37-acre Sherburn42 scheme sits adjacent to the Sherburn Enterprise Park in Leeds and comprises the construction of four Grade-A industrial units ranging from 57,750 to 280,000 sq. ft., with industrial warehouse and office space to support core building services.

The design concentrated on helping occupiers reach operational sustainability targets and the project will be accredited net-zero carbon in construction by the UK Green Building Council. Set to achieve a BREEAM ‘Excellent’ rating, the logistical hub features EV charging, full PV coverage and LED office lighting, alongside 4MvApower.

The Engineering Services Consultancy Ltd (ESC) was appointed by McLaren Construction Midlands and North to undertake a Whole Life Embodied Carbon assessment of the build at as-built RIBA Stage 5. The subsequent report showed that the contractor surpassed its project target of 550 kgCO2e/m2, achieving 458.32 kgCO2e/m2.

McLaren Construction surpasses Net Zero Targets at Landmark Leeds Logistics Hub featured image

Related News
19 August 2025

McLaren secures Heathrow Airport Industrial and Logistics scheme

31 July 2025

Plot 3 completes at Matrix 49, advancing sustainable industrial hub in Avonmouth

28 July 2025

McLaren Construction celebrates completion of major industrial and logistics development at Omega West